Inter-Building Walkway Bridge
Steel walkway bridge between two buildings — HEA/IPE structure, open-grid floor, code-compliant railing.
The inter-building walkway connects two buildings or two levels of an industrial site without routing via ground level. The self-supporting steel structure is calculated for 350 to 500 kg/m² live load. The galvanised open-grid floor deck allows rainwater drainage. Labour-code-compliant railings ensure user safety throughout.
Features
- <ul><li>Self-supporting HEA/IPE structure</li><li>Live load 350–500 kg/m²</li><li>Galvanised open-grid deck</li><li>Labour-code-compliant railing</li><li>Expansion joints for spans > 12 m</li></ul>
Materials
Specifications
Span 3–15 m. Clear width 1.00–1.50 m. Manufactured to European standards.
Perforated Sheet Cladding
Perforated steel or aluminium façade cladding — custom design, parametric perfor...
Suspended Steel and Timber Deck
Suspended deck on galvanised steel structure — timber or composite decking, inte...
Corten Steel Façade
Self-weathering Corten steel cladding and façade — natural rust aesthetic, maint...
Cantilevered Balcony on Steel Brackets
Add-on balcony on welded steel brackets — in-situ concrete or steel floor, glass...
+33 (0)7 84 05 73 75